- Case Studies
- LM3
- LM3 Hub
LM3 Hub Case Studies
The LM3 Hub, where organisations set up projects, map their suppliers and see their LM3 results.
The case studies
01
LM3 is used by large organisations such as Morgan Sindall, Kier and EDF, each with many staff, divisions and regions running their own projects.
New feature
User access
Sep 2026
02
An LM3 result is only as good as the supplier information behind it. The most accurate figures come when suppliers themselves say how much of their own spending, and their staff's, stays local.
New feature
Calculations
Sep 2026
03
Each LM3 study is a project: a contract, a site or a year of spending, with its own suppliers, map and results. Organisations often run several at once, and each one moves through stages from setting up to gathering results.
New feature
Usability
Mar to Sep 2026
04
What counts as "local" depends on where an organisation works. A construction site, a university and a hospital trust each draw their local area differently, and LM3 needs that area before it can say which suppliers are local.
New feature
Calculations
Mar to Sep 2026
05
LM3, short for Local Multiplier 3, is a proven method for measuring how much of an organisation's spending stays in its local economy. It follows each pound through three rounds: the organisation's own spend, what its suppliers then spend locally, and what their staff and suppliers spend in turn. LM3 Online, run by Impact Measurement Ltd, turns the method into an online tool.
New feature
Calculations
Aug 2026
Facing something similar? Ask our chat what we’ve built for others.